GS1 publishing
Changing provider should lower the risk, not create it
You do not need to rebuild your systems to change the route out to your data pools. We move structure and validation logic, and make the packaging data report-ready in the same work.
30 minutes. We review a range against your data pool and tell you straight out whether you have a problem.
Transition status · current publishing
- Items read1,482
- Hierarchies matchedChecked
- Fields without a counterpartListed
- Publishing testDate planned
Illustrative status view. Not a product view.
The objections
What you are actually worried about
“We will lose data in the move.”
We do not migrate by exporting and hoping. Items, hierarchies and relations are read against your current publishing, and deviations are listed before anything moves. What you do not have today will not magically appear — but you will know exactly what is missing.
“We are locked into the contract until next year.”
That is usually the right time to start, not the wrong one. The diagnosis and preparation take weeks, not days, and can be done while the current contract runs. We help you read the notice period before you decide anything.
“We cannot afford to run two systems in parallel.”
The overlap is limited to the period you need in order to verify that publishing goes through. We plan that period in advance, with a date.
“We would have to revalidate the whole range.”
No — but you will know which items would not pass today. That is the same work whether you switch or stay.
Scope
What we do not do
No IT rebuild
We do not touch your ERP or PIM. We change the route out to the data pool, not the systems you work in.
No guessed data
Missing weights, materials and measures are not filled in by feel. If a value is missing, it says so.
No lock-in
The structure and the validation logic are yours. You should be able to move on without starting over.
A team in Umeå with more than 20 years of experience in product data.
How it works
Three steps, each with a date
01
Diagnosis
We run a range against the rules of your data pool and show what would be rejected today — regardless of provider.
02
Transition and migration
Structure, hierarchies and validation logic are moved. Publishing is verified before the old route is closed.
03
Ongoing rule monitoring
Field requirements and regulations change. We follow the changes and tell you before they hit your range.
Reach
One way out, twelve recipient systems
The same item data should reach Validoo, EPD, Synkka and ten more systems. We handle the rules that separate them.
Timing
Find out where you stand ahead of the next contract period
- Which items would not pass today
- What a switch actually requires of you — and what it does not
- What notice period and overlap you need to plan for
Book a data diagnosis
30 minutes. We review a range against your data pool and tell you straight out whether you have a problem.